View Single Post
Old 07-28-2008, 01:21 PM   #2
05svr650
Supporting Vendor
 
05svr650's Avatar
 
Join Date: Feb 2008
Location: Soon to be Temple, TX
Moto: wide open throttle
Posts: 108
Default Day 2

Day 2

Starting day 2 was a bit intimidating. I built a stand at work to support the weight of the bike, since I did not have anything above to tie it to.
1. removed gas tank to add some clearance between the bike frame and stand.
2. I used 2 ratchet straps to secure the bike and raise it off the ground.
3. unplugged and removed the fairing stay and gauge cluster.
4. unplugged the speed sensor, this is located just in front of the airbox.
5. remove all controls from clip ons
6. remove steering stem nut and top triple tree
7. remove castle nuts and dust cover
8. now the entire front end should be able to be removed

Time for day 2: 120 minutes
Attached Images
File Type: jpg IMGP0196-640x480.jpg (102.1 KB, 62 views)
File Type: jpg IMGP0197-640x480.jpg (107.0 KB, 59 views)
File Type: jpg IMGP0198-640x480.jpg (107.2 KB, 59 views)
File Type: jpg IMGP0199-640x480.jpg (94.2 KB, 60 views)
File Type: jpg IMGP0200-640x480.jpg (98.6 KB, 61 views)
File Type: jpg IMGP0201-640x480.jpg (96.5 KB, 60 views)
File Type: jpg IMGP0202-640x480.jpg (100.8 KB, 58 views)
File Type: jpg IMGP0203-640x480.jpg (110.9 KB, 59 views)
File Type: jpg IMGP0204-640x480.jpg (54.6 KB, 56 views)
__________________


www.JandBcycle.com
05svr650 is offline   Reply With Quote