Quote:
Originally Posted by karl_1052
45 minutes is cake.
It take 2.5 hours to remove and replace the fairings on a Gen II
|
It takes about an hour to pull the sides off a gen 1 but to lust lift the tanks is 4 bolts. On the King it takes 45 minutes 4 push rivets and 6 bolts to lift the tank.