Go Back   Two Wheel Fix > In the Garage or Shop > Model Reviews

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 07-31-2009, 09:17 PM   #9
nhgunnut
gun totin redneck
 
Join Date: Apr 2008
Location: South West New Hampshire
Moto: turbo busa 999 Duc Goldwing & Victory
Posts: 1,130
Default

Quote:
Originally Posted by karl_1052 View Post
45 minutes is cake.

It take 2.5 hours to remove and replace the fairings on a Gen II
It takes about an hour to pull the sides off a gen 1 but to lust lift the tanks is 4 bolts. On the King it takes 45 minutes 4 push rivets and 6 bolts to lift the tank.
__________________
Evolution requires a body count, Count or be Counted!
nhgunnut is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 10:48 PM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.