Go Back   Two Wheel Fix > Riding > Street

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 01-29-2009, 08:24 PM   #14
HRCNICK11
Canyon Carver
 
Join Date: Nov 2008
Posts: 429
Default

Quote:
I'm spoiled with Italian engineering that takes about a minute to take all the plastics off the bike. 22 seconds if it's just the sides...
Only problem is half the time you order them they send you ones that have the holes in the wrong place. Or the dzus clips are missing or it takes 6 months to get it. We will not even talk about the bolts that loosen up cause they don't use loctite.

Sorry Azoom but I have worked on a few too many ducks on the side of the road to love them. My friends 748 was nicknamed "the little yellow Harley". I bought him a key chain that was a duck in a life vest. Between that and the buell it was like a rolling bike repair clinic at the gap a few years back.

Now I'd rock a Priller or a KTM.
HRCNICK11 is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 05:59 AM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.