![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
|
|
|
|
#1 |
|
Designated Drinker
Join Date: Jul 2008
Location: shitville
Moto: 2009 ZX6R
Posts: 1,661
|
Yep. Tubing should be here Monday. Was planning on all straight tube, but now that I'm gonna add about 6", I'm thinking I will need to bend the bottom tube. Kinda dreading that, but I'll figure it out.
__________________
|
|
|
|
|
|
#2 |
|
flyin high
Join Date: Mar 2008
Location: cali
Moto: 10speed huffy w/cards in the spokes
Posts: 2,318
|
nothing to say, cept i like where this is going
__________________
"Racing Is Life, Everything Before and After is Just Waiting" Steve McQueen |
|
|
|
|
|
#3 |
|
Designated Drinker
Join Date: Jul 2008
Location: shitville
Moto: 2009 ZX6R
Posts: 1,661
|
Ok, so I got a little more done last night in the heat.
First, made a jig to keep the alignment of my wheels. ![]() Measured for a possible 6" or 8" stretch ![]() Next, cut away the swingarm while keeping the axle plates ![]() Decided on the 8" stretch to give me plenty of room under the seat for the battery, electrical. Fixed a block in front of the rear wheel to keep it in place at my measurement. ![]() After blowing up my POS grinder and a trip to Lowes for a new one, lots of grinding ![]() My hardtail "kit" ![]() ![]() First piece cut and set in place for a look. ![]() ![]() That was as far as I got last night. Tonight will be more cutting and fitting. Anybody got advice on notching the tubing to the axle plates? The way I'm doing it just doesn't seem right.
__________________
|
|
|
|
![]() |
| Bookmarks |
| Thread Tools | |
| Display Modes | |
|
|